Preparatory work to ensure the normal operation for fly ash brick making machine

2014-10-30

After installing the machine to ensure the normal operation, the work we need to do:
First, carefully check the fly ash brick making machine during transport if there is damage or deformation, with particular attention to the hydraulic line.
Second, pay attention to the main part of the machine Haka Are there loose fasteners, if found please timely manner.
Third, check the reducer.
Finally, we need to conduct a comprehensive swabbing the machine work, even before the test machine moving parts slide relative to each site according to the provisions of lubrication.